Rest of semester due dates
Monday, March 18th: Individual reports/memos
· Hydrology specialists
o Accurate and working model for the entire site
o Dr. Li will send out an email with more detailed requirements
· Sustainability specialists
o 90% complete solar model (including angles, sizing, technical specifications) that is applicable to the site
· Environmental specialists
o Choice of all processes finalized for LID and stormwater treatment
o Demonstration of how you will meet all local, state, and federal requirements for stormwater treatment and discharge to the sanitary sewer.
o Selection of pre-treatment processes of stormwater for truck washing (if used)
§ Justification
§ Expected treatment efficiency
o Selection of post-treatment process(es) of truck washwater before discharge
§ Justification
§ Expected treatment efficiency
o Sizing, material specification, and location of sewer lines and water service line onsite (outside buildings)
o Location of hydrants (with fire truck access)
Sunday, March 24th
· Hydrology specialists
o Final design
§ Water flow
§ Stormwater conveyance system and pumping
§ Demonstration that system meets applicable codes and standards
· Sustainability specialists
o 100% complete solar model (including installation, discussion of how to make system appealing to Consumers) that is applicable to the site
o LEED standards
· Environmental specialists
o Design of all processes finalized for LID and stormwater treatment
§ Meets all local, state, and federal requirements for stormwater treatment and discharge to the sanitary sewer.
§ Efficacy
o Design and costing of pre-treatment processes of stormwater for truck washing (if used)
§ Design specifications
§ Efficacy
§ Economic analysis
o Design of post-treatment process(es) of truck washwater before discharge
§ Design specifications
§ Efficacy
§ Economic analysis
Friday, March 29
· Draft report (individual)
Friday, April 5
· Mentors return report with comments
Friday, April 12
· Final reports (individual)
Friday, April 19
· Design Day: final presentations
· Non-technical reports due