Update: Feb 3, 2024
Greetings,
I hope you are all well. You should have received an
email today with a link to our comments on your report. Chenyang will
be adding his comments related to the energy aspects of the project, if
he hasn't done so already.
We would like to meet with all of you before requiring the submission of the revised Memo 1. As such, here is the schedule for Tuesday's meeting:
- 3-4 PM All ENE/Hydrology students in 1538 EB
- 4-5:50 PM Hydrology students in 1538 EB
- 4-5 PM ENE students in 1300 EB (if we need to meet longer we can try to find a room)
- 4-5:50 PM Sustainability students in Trans Lab
In your revised memo, you need to explain the proposed conceptual design
and how the different elements work together to achieve your overall design objectives. Your plan must be executable with "complete"
details, in terms of the types of system objects to be included, layout,
and connections. To assist you in achieving your goals, you will be
required to also submit a GANTT chart with Memo 1. The GANTT chart is
to include a general outline of tasks and work assignments necessary to
complete the project. The timeline should also show all key due dates,
critical decision points, the extent of completion of tasks, and
identified meetings. It should be updated throughout the semester. You
should plan to present the GANTT chart along with other key documents to
your PEs at the mid-semester meeting. You are also to submit a site
plan (11" x 17" document) with Memo 1 that is legible and professionally
done.
The revised Memo 1, GANTT chart, and site plan are due on Monday, Feb 12 at 11:59 PM.
Chenyang, Dr. Li, and Dr. Masten
Comments